Our Projects
A selection of completed commercial and aerospace construction projects across Southern California.

Blue Origin Facility
Comprehensive 65,000 sq ft commercial tenant improvement including process cooling pipe work, major electrical infrastructure upgrade, complete plumbing systems, and HVAC installation.

Motiv Space Systems Facility
Complete demolition, remodel, and buildout of a single-story building for aerospace company Motiv Space Systems.

Pasadena Business Park
Demo and rebuild of 14 suites totaling 21,000 sq ft, restoring the business park back to original condition with approximately 1,500 sq ft per suite.

Honeybee Robotics - Receiving Dock
Precision structural modification including 10' x 15' roll-up bay door installation through existing block wall, engineered structural bracing, reinforced concrete foundation, and ADA-compliant safety railing.

Honeybee Robotics - Kaiser Compressor
Complete turnkey installation of Kaiser industrial compressor system including precision foundation engineering, heavy equipment rigging, electrical service installation, and process piping integration.

XTENTI - ISO 8 / ISO 7 Capable Cleanroom
Full build-out of a 600 sq ft ISO 8 cleanroom, also ISO 7 capable, engineered to meet stringent contamination control standards for precision manufacturing and R&D operations.
